• Home
  • keyboard_arrow_right Africa
  • keyboard_arrow_right Featured
  • keyboard_arrow_right
  • keyboard_arrow_right Can Zambia Build Power Fast Enough for Its Next Wave of Industrial Growth?

Africa

Can Zambia Build Power Fast Enough for Its Next Wave of Industrial Growth?

Blessing Afolabi September 25, 2026


Background
share close

Zambia’s electricity demand is rising, driven by mining, industrialisation, agriculture and urbanisation. But meeting that demand will require more than adding a new generation. Power trading, transmission investment and stronger regional connections will all have a role to play.

Hosted by Energy News Network (ENN) in partnership with The Electricity Hub, Let’s Talk Energy continues its series recorded live at the Africa Energy Forum 2026 in Cape Town with Martin Kasemuka, CEO of Lunzua Power Company.

The conversation examines Zambia’s evolving power market and why Kasemuka sees opportunity across the electricity value chain, from solar, hydro, and thermal generation to transmission infrastructure and cross-border power trading.

With transmission constraints limiting how effectively electricity can move between surplus and deficit markets, Kasemuka discusses proposed connections with the DRC and links to Tanzania, Zimbabwe, Botswana, and South Africa, as well as the role that trading can play in supporting new investment.

As Zambia’s mining and industrial sectors expand, the episode asks a critical question: can generation, transmission and regional power trading grow quickly enough to keep pace with demand?

Tagged as: , , , , , , , , , .

Rate it
Previous post
Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *